Hard Engineering

  • Briddlington protected by 4.7km sea wall
  • Two rock Groynes and a 500m long revetment were built at Mappleton in 1991. Cost £2 million and were built to protect village and the B1242 coastal road
  • Groynes and a Sea Wall put in place at Withernsea, rip rap was also placed
  • concrete wall, timber groynes and riprap at Hornsea 
  • Gabions just south of Hornsea