Testing 0.0 / 5 ? ICTSystems Life CycleGCSEOther Created by: swimminggirl123xx_xDCreated on: 26-05-16 14:59 Data that is outside the acceptable levels. Abnormal data 1 of 6 Data that lies on the edge of the acceptable limits. Extreme data 2 of 6 Data that lies within the acceptable limits. Normal data 3 of 6 Something you do to find the results of something. Test 4 of 6 The stage before testing. Design 5 of 6 What is stage 1? Analysis 6 of 6
Comments
No comments have yet been made