Testing 0.0 / 5 ? ICTSystems Life CycleGCSEOther Created by: swimminggirl123xx_xDCreated on: 26-05-16 14:59 246531 Across 1. Data that lies within the acceptable limits. (6, 4) 5. Something you do to find the results of something. (4) 6. The stage before testing. (6) Down 2. Data that lies on the edge of the acceptable limits. (7, 4) 3. What is stage 1? (8) 4. Data that is outside the acceptable levels. (8, 4)
Comments
No comments have yet been made