Human Geography Fieldwork Evaluation
- Created by: benof001
- Created on: 05-01-19 17:55
View mindmap
- Evaluation
- Method
- Vehicle Mobility survey
- Took a lot of time
- Accuracy low as traffic levels not constant and they would fluctuate
- Traffic depends on the time
- Occupancy Survey
- Cars come and leave so hard to count
- Went to only one of 3 Park an Rides
- We went at 10 am to the Park and Ride peak time may be at a different time
- Not reliable information as data will fluctuate throughout the day
- You can make it better by taking an aerial picture at different times then count the cars in the car park, then find a mean number of occupied and unoccupied spaces
- Local Residents Survey
- Not enough surveyers
- Only represents a small portion of Shrewsbury
- Given very vague answers
- Better if we had more time to conduct survey and ask more people
- Vehicle Mobility survey
- Validity of Conclusions
- The occupancy survey is not reliable so it can mean that the conclusion is one sided and does consider all the factors
- Method
- Vehicle Mobility survey
- Took a lot of time
- Accuracy low as traffic levels not constant and they would fluctuate
- Traffic depends on the time
- Occupancy Survey
- Cars come and leave so hard to count
- Went to only one of 3 Park an Rides
- We went at 10 am to the Park and Ride peak time may be at a different time
- Not reliable information as data will fluctuate throughout the day
- You can make it better by taking an aerial picture at different times then count the cars in the car park, then find a mean number of occupied and unoccupied spaces
- Local Residents Survey
- Not enough surveyers
- Only represents a small portion of Shrewsbury
- Given very vague answers
- Better if we had more time to conduct survey and ask more people
- Vehicle Mobility survey
- Method
- The occupancy survey is not reliable so it can mean that the conclusion is one sided and does consider all the factors
- Method
Comments
No comments have yet been made