New Groynes were put in place along the beach in 2005/2006. The beach replenishment cost £5 million and it will need to be replenished every 20 years. Which beach is it?
Back
Card 8
Front
Source to mouth of the River Thames is how long?
Back
Card 9
Front
The River Thames is the most populated river basin, shared by how many people?
Back
Card 10
Front
What percentage of Londons water supply comes from groundwater in chalk?
Back
Card 11
Front
How much rain fell in the 2013/2014 wettest winter record?
Back
Card 12
Front
As part of a project to reduce flooding on the Thames, the Jubilee River was put in place, and now another river is going to be built. How much is this project costing?
Back
Card 13
Front
How many homes and businesses were flooded in the 2014 floods, which cost London £500 million to clear up?
Back
Card 14
Front
What is this: 10 barriers (4 small and 6 large), 520m across the river, Barriers can shut in 15 minutes if required quickly; if not 90 minutes
Back
Card 15
Front
How many new homes could be created on the old Barking Riverside Power Plant?