electrcial installation technology (27)

?
  • Created by: lee42
  • Created on: 07-03-20 22:35
What are 4 requirement when planning to install micro renwable system?
legal, regulatory, building location, builidng fabric
1 of 13
is planning permission required to install micro hydro
YES
2 of 13
what license is required to install micro hydro
abstraction license
3 of 13
benfits of micro photo voltaic
eco friendly, affordable, save money, low maintance cost
4 of 13
What is FIT in regards to solar energy?
Feed IN Tariff, is an accelrate invetsment in renwable energy
5 of 13
What is grey water used for?
Used for laundary, toilet flushing
6 of 13
can grey water be stored for a long time
no longer than 24hrs
7 of 13
what is the benefit of GSHP? (geo thermal heat pump)
safe,silient,out of sight
8 of 13
what is the disadvantage of GSHP? (geo thermal heat pump)
expensive, disrupt garden
9 of 13
what is cicurlated around a ground loop?
current
10 of 13
what is the biggest source of renwable energy in uk?
wind
11 of 13
differnce betwwen standard boiler to micro CHP
Micro CHP generates electricity when heating water
12 of 13
What do you need to install Micro CHP
Microgenration certification scheme (MCS)
13 of 13

Other cards in this set

Card 2

Front

is planning permission required to install micro hydro

Back

YES

Card 3

Front

what license is required to install micro hydro

Back

Preview of the front of card 3

Card 4

Front

benfits of micro photo voltaic

Back

Preview of the front of card 4

Card 5

Front

What is FIT in regards to solar energy?

Back

Preview of the front of card 5
View more cards

Comments

No comments have yet been made

Similar Other resources:

See all Other resources »See all micro renwable energy resources »