Testing 0.0 / 5 ? ICTSystems Life CycleGCSEOther Created by: swimminggirl123xx_xDCreated on: 26-05-16 14:59 432516 Across 1. What is stage 1? (8) 6. Data that lies within the acceptable limits. (6, 4) Down 2. The stage before testing. (6) 3. Data that is outside the acceptable levels. (8, 4) 4. Data that lies on the edge of the acceptable limits. (7, 4) 5. Something you do to find the results of something. (4)
Comments
No comments have yet been made