When ICT systems are dispersed over many locations
Distributed Systems
1 of 10
Type of Testing where the tester is in the dark about how the system is created
Black Box Testing
2 of 10
Testing where the tester knows how the system was created.
White Box Testing
3 of 10
Testing where the users test the system to ensure they are happy with the new system.
User Acceptance Testing
4 of 10
Installing a system where both the old and new system are running together
Parallel conversion
5 of 10
Installation where the SYSTEM is introduced into the organisation a module at a time
Phased conversion
6 of 10
The old system is replaced by the new system straight away.
Direct conversion
7 of 10
Type of maintenance where the client wants the system to do something extra. This is not a compulsory change.
Perfective Maintenance
8 of 10
This is a compulsory change because something in the environment has changed. e.g. Grade boundaries have changed.
Adaptive Maintenance
9 of 10
A mini program, a brief peice of code that will make the changes to overcome a specific problem in the software after it has been released and being used.
Software Patch
10 of 10
Other cards in this set
Card 2
Front
Type of Testing where the tester is in the dark about how the system is created
Back
Black Box Testing
Card 3
Front
Testing where the tester knows how the system was created.
Back
Card 4
Front
Testing where the users test the system to ensure they are happy with the new system.
Back
Card 5
Front
Installing a system where both the old and new system are running together
Comments
No comments have yet been made