INFO 3 SDLC and Introducing large organisations

?
  • Created by: mrkhan
  • Created on: 19-10-13 14:36
When ICT systems are dispersed over many locations
Distributed Systems
1 of 10
Type of Testing where the tester is in the dark about how the system is created
Black Box Testing
2 of 10
Testing where the tester knows how the system was created.
White Box Testing
3 of 10
Testing where the users test the system to ensure they are happy with the new system.
User Acceptance Testing
4 of 10
Installing a system where both the old and new system are running together
Parallel conversion
5 of 10
Installation where the SYSTEM is introduced into the organisation a module at a time
Phased conversion
6 of 10
The old system is replaced by the new system straight away.
Direct conversion
7 of 10
Type of maintenance where the client wants the system to do something extra. This is not a compulsory change.
Perfective Maintenance
8 of 10
This is a compulsory change because something in the environment has changed. e.g. Grade boundaries have changed.
Adaptive Maintenance
9 of 10
A mini program, a brief peice of code that will make the changes to overcome a specific problem in the software after it has been released and being used.
Software Patch
10 of 10

Other cards in this set

Card 2

Front

Type of Testing where the tester is in the dark about how the system is created

Back

Black Box Testing

Card 3

Front

Testing where the tester knows how the system was created.

Back

Preview of the front of card 3

Card 4

Front

Testing where the users test the system to ensure they are happy with the new system.

Back

Preview of the front of card 4

Card 5

Front

Installing a system where both the old and new system are running together

Back

Preview of the front of card 5
View more cards

Comments

No comments have yet been made

Similar ICT resources:

See all ICT resources »See all ICT systems resources »