INFO 3 SDLC and Introducing large organisations 2.0 / 5 based on 1 rating ? ICTICT systemsA2/A-levelAQA Created by: mrkhanCreated on: 19-10-13 14:36 27865431 Across 1. This is a compulsory change because something in the environment has changed. e.g. Grade boundaries have changed. (8, 11) Down 2. Installing a system where both the old and new system are running together (8, 10) 3. A mini program, a brief peice of code that will make the changes to overcome a specific problem in the software after it has been released and being used. (8, 5) 4. The old system is replaced by the new system straight away. (6, 10) 5. Installation where the SYSTEM is introduced into the organisation a module at a time (6, 10) 6. Testing where the tester knows how the system was created. (5, 3, 7) 7. Type of Testing where the tester is in the dark about how the system is created (5, 3, 7) 8. When ICT systems are dispersed over many locations (11, 7)
Comments
No comments have yet been made