2. What is running the old and new system alongside each other known as?

  • direct changeover
  • parallel running
  • twin running

3. The input, processing and output from the new system will be identified in which document?

  • analysis specification
  • systems report
  • requirements specification

4. Which of these is the correct order to perform things?

  • Analysis, design, implementation, evaluation
  • Implementation, design, analysis, evaluation
  • Evaluation, analysis, implementation, design

5. What document is produced to identify whether the project is technically possible and worth the cost of development?

  • feasibility study
  • analysis report
  • profit and loss account